 Industrial Facility Roof Assessment

Industrial Facility
Roof Assessment

 

Arrow Down

Survey undertaken by Lee Cunningham in a previous professional role. Client details have been removed for confidentiality.

Location, West Sussex, UK

Property Type: Industrial Facility

PROJECT OVERVIEW

We were instructed to carry out a detailed drone roof survey of a large industrial facility to assess the condition of the roof and identify any defects or maintenance issues. The survey was completed using high-resolution aerial imagery, allowing for a safe, efficient inspection with zero disruption to operations. 

BUILDING TYPE

Industrial Facility

ROOF AREA

Approx 25,000 m2

INSPECTION METHOD

Drone Survey

SURVEY DATE

May 2024

WEATHER CONDITIONS

Clear Skies

REPORT TURNAROUND

5 Working Days

INSPECTION SCOPE

Roof coverings

Plant and equipment areas

Rooflights and skylights

Access systems and walkways

Rainwater goods and drainage

Cladding interfaces

Parapets and flashings

Gutters and outlets

Penetrations and upstands

Roof fixings and sheet laps

RISK SUMMARY

Risk Category

Rating

Water Ingress Risk

MEDIUM

Structural Integrity

LOW

Maintenance Priority

MEDIUM

LOW

Immediate Safety Risk

Overall Roof Condition

FAIR

ACCESS & METHOD

Drone Inspection

No Roof Access Required

High Resolution Imagery

Zero Disruption to Operations

782

Images Captured

48

Roof Elements Inspected

17

Defects Indentified

Approx. 25,000 m²

Roof Area Surveyed

3-4 Hours 

On Site

CHALLENGES ENCOUNTERED

Large roof area with multiple sections and varying roof types.

Restricted access due to on-site operations and busy yard activity.

Several areas of the roof were difficult to access safely without aerial inspection. 

Requirement for minimal disruption to daily business operations. 

KEY FINDINGS

Several areas of membrane damage and blistering identified across the roof.

MEDIUM

Multiple instances of ponding water due to inadequate falls and blocked outlets. 

LOW

Sealant deteriation around rooflights and penetrations.

HIGH

General wear and tear consistent with the age of the building.

MEDIUM

RECOMMENDATIONS

Repair damaged membrane sections

Clear and maintain all guttering and outlets to improve drainage. 

Reseal rooflight and penetrations to prevent leaks

Schedule a folllow up survey in 12 months

ORTHOMOSAIC OVERVIEW

High-resolution orthomosaic created
from 612 aerial images, providing a
measurable, accurate overview of
the entire roof.

Aerial top-down view of a large industrial warehouse

EQUIPMENT USED

DJI MAVIC 3 PRO

48MP Camera

Optical Zoom

GPS Positioning

Orthomosaic Mapping

Roof Condition Assessment

WHY CHOOSE CRS

CAA Registered Drone Operator

Qualified Building Surveyor

Fully Insured

Detailed Digital Reports

ANNOTATED FINDING EXAMPLE

Industrial roof inspection showing damage and maintenance points

DEFECT PRIORITY MATRIX

LOW

DEFECT TYPE

Rooflight damage

Ponding Water

Sealant deterioration

HIGH

LOW

0-6 Months

MEDIUM

MEDIUM

HIGH

RISK

PRIORITY

ACTION TIMEFRAME

Gutter debris

Minor membrane wear

Loose fixings

HIGH

MEDIUM

LOW

LOW

LOW

LOW

0-3 Months

3-12 Months

6-12 Months

3-12 Months

Immediate

PLANNED MAINTENANCE PROGRAMME

IMMEDIATE
Repair damaged membrane and rooflights

SHORT TERM (0-3 MONTHS)
Clear and maintain all guttering and outlets to improve drainage

PLANNED (0-12 MONTHS)
repair roof lights and penetrations to prevent leaks

ONGOING (12 MONTHS)
Schedule a follow-up survey in 12 months

EXECUTIVE SUMMARY

OVERALL ASSESSMENT:
The inspection identified several maintenance items together with localised defects requiring planned remedial work.

No immediate structural concerns were observed during the inspection however, repairs to damaged roof elements, rooflights flashing and rainwater goods are recommended to maintain building performance and extend its service life.
 

PRIORITY ACTIONS:

Repair damaged membrane sections
Clear gutters and outlets
Reseal roof-lights and penetrations
Improve drainage and fall

 Schedule a follow up survey in 12 months

Professional. Precise. Zero Disruption.

WHAT YOU'LL RECEIVE

Industrial roof survey report for a West Sussex facility.

See exactly what you'll receive. Our detailed reports include high-resolution photographs, findings, risk assessments and clear recommendations.

Detailed findings and condition assessments

Annotated photographs

Risk ratings and priority matrix

Maintenance recommendations

Delivered digitally in PDF format

12 Page Sample Report (3.2 MB)

SURVEY GALLERY

High-resolution drone imagery captured during the inspection.
Client-sensitive information has been removed where appropriate.

Need a survey for your property?

Get in touch today for a free, no-obligation quote

bottom of page